Electrical verification is the final, critical bridge between "mechanically complete" and "grid-connected." In Solar QA/QC, this phase ensures that the DC energy harvested by the modules is safely transported, inverted, and stepped up without thermal failure or fire risk. The verification process is typically divided into Cold Commissioning (pre-energization) and Hot Commissioning (post-energization).